The Perm-Lok permanently engages the Central Axle Disconnect (CAD) system
and couples both front axles. Once installed, the front axles will not pull
until the transfer case is engaged. This application is ideal for fleet
operators, emergency vehicles, or off-road vehicles. Installation is easy and
can be completed in approximately 30 minutes.
- Part No. 1100 Includes:
- • New cast aluminum housing with gasket kit
- • New machined inner push rod to lock the central axle disconnect in an
engaged position
- • Easy to follow Instructions
|